This was good enough most of the time. However, during the wetter months it was necessary to have a good 4x4 to get across the rambla, and at other times it was impossible · one had to wait until it had dried out. Once building started in earnest and Masa were back and forth with building materials, the new bridge soon followed.
Sector C is divided into 2 main areas, known locally as upper C and lower C, as they are some distance apart. The building plots were selling so fast that it was not always possible to view a plot and manage to buy it on the same day. This area is not so close to the commercials of the other sectors, and those who enjoy a more peaceful life simply love it.
Not all the houses on Sector C were built by MASA. Another promoter known as "Monsora" purchased some of the land on lower C and built several smaller properties. These were not sold "off plan" but once completed. The timing was poor · just as they were released for sale, the big recession of 2007 had already started, and these properties soon became the property of a bank. Today, the market has significantly improved, and Camposol has more buyers than available properties. Long may it continue.